Solvent unloading station
2013 Modernization and adaptation of the solvent unloading station to the requirements of
Transport Technical Supervision at the Bitumex production facility in the town of Dębowa
near Kędzierzyn Koźle.
Glassworks
Steel production
2013 Execution of instrumentation works at the ammonia unloading, storage and supply
installation
Steel production
2013 Design and execution of a tank measurement installation
Aviation industry
2012 Execution of control boxes including wiring.
2012 Supply and installation of air conditioning systems for various offices.
Aviation industry
Silesian University of Technology
2010 Execution of the control system of Cu-Zn and Fe-Cr catalyst dryers.
Meat Company
1999-2010 Repair, inspection, calibration, and service of the instrumentation equipment.
Institute for Chemical Processing of Coal
2008 Delivery of a set of analysers of dust and exhaust density and transparency.